Get information on conducting drainage tests, connecting refrigerant piping, and more.
Conduct Drainage Tests for 4- & 8-Way Ceiling Cassette Systems
This article explains how to perform and complete drainage tests for four-way and eight-way ceiling cassettes.
Conduct Drainage Tests for Ducted Ceiling Concealed Systems
This article explains how to run and complete a drainage test for ducted ceiling concealed systems.
Conduct Drainage Tests for Floor/Low-Wall Mounted Systems
This article explains how to perform and complete drainage tests for floor/low-wall mounted systems.
Conduct Drainage Tests for Single-Way Ceiling Cassette Systems
This article explains how to run and complete a drainage test for single-way ceiling cassette systems.
Conduct Drainage Tests for Wall-Mounted Systems
This article explains how to run and complete a drainage test for wall-mounted systems.
Connect the Refrigerant Piping
This article explains how to connect refrigerant piping for ceiling cassette systems.
Conduct Test Runs
This article explains how to conduct and complete a test run for our systems.