UYB Floor/Ceiling/Low-Wall Flex Units
Learn how to install UYB-20 floor/ceiling/low-wall flex systems.
Installing UYB-20 Floor/Ceiling/Low-Wall Flex Systems: Getting Started
This article provides an overview of the installation process for the Quantum Ultra Floor/Ceiling/Low-Wall Flex (UYB-20) system.
Selecting the Installation Locations for UYB-20 Floor/Ceiling/Low-Wall Flex Systems
Learn how to choose the correct installation sites for the Quantum Ultra Floor/Ceiling/Low-Wall Flex (UYB-20) indoor and outdoor units.
Hanging the Indoor Unit for UYB-20 Floor/Ceiling/Low-Wall Flex Systems
Learn how to hang the indoor unit for the Quantum Ultra Floor/Ceiling/Low-Wall Flex (UYB-20) system.
Installing the Conduit Installation Plate for UYB-20 Floor/Ceiling/Low-Wall Flex Systems
Follow these steps on installing the conduit installation plate for the Quantum Ultra Floor/Ceiling/Low-Wall Flex (UYB-20) system.
Drilling the Piping Wall Hole for UYB-20 Floor/Ceiling/Low-Wall Flex Systems
Learn how to drill the wall hole for the Quantum Ultra Floor/Ceiling/Low-Wall Flex (UYB-20) piping.
Installing the Condensate Drain Hose for UYB-20 Floor/Ceiling/Low-Wall Flex Systems
Follow this procedure on installing the condensate drain hose for the Quantum Ultra Floor/Ceiling/Low-Wall Flex (UYB-20) system.
Connecting the Communication Cable for UYB-20 Floor/Ceiling/Low-Wall Flex Systems
Learn how to connect the communication cable for the Quantum Ultra Floor/Ceiling/Low-Wall Flex (UYB-20) system.