Conducting Drainage Tests for Wall-Mounted SystemsUpdated 3 days ago
Introduction
Learn the procedure for conducting and completing drainage tests on wall-mounted units.
This test ensures the drainpipe properly directs condensate to a suitable location.
This article applies to the following systems:
- Diamante Essenza High-Wall (WYT-17)
- Diamante Pro High-Wall (WYT-20)
- Quantum Ultra High-Wall (WYT-24)
- Quantum Hyperformance High-Wall (WYT-25)
- Quantum Fresh High-Wall (WYT-FA)
Steps
1. Open the front panel.
2. Remove any filters.
3. Pour water over the coils.
4. Check whether the water is exiting the drain point correctly. 