Complete the System Startup for Vertex Ducted Central Split (DYC-18) SystemsUpdated 11 days ago
Introduction
This article explains how to complete the system startup for Vertex Ducted Central Split (DYC-18) systems.
Steps
- Turn off the system thermostat.

- Turn on the disconnect switch and apply power to the indoor and outdoor units.

- When starting the unit for the first time while the outdoor temperature is below 70°F (21°C), it is recommended to let the crankshaft heater preheat for 1 hour before turning on the unit. When starting the unit for the first time in Heating mode while the outdoor temperature is below 23°F (-5°C), the system will force preheat for 1 hour before turning on the unit. PRH will display in the screen.

- Turn on the system thermostat.