Conduct Drainage Tests for Wall-Mounted SystemsUpdated 2 hours ago
Introduction
This article explains how to run and complete a drainage test for wall-mounted systems.
This test ensures the drainpipe properly directs condensate to a suitable location.
This article applies to the following systems:
- Diamante Essenza High-Wall (WYT-17)
- Diamante Pro High-Wall (WYT-20)
- Quantum Ultra High-Wall (WYT-24)
- Quantum Hyperformance High-Wall (WYT-25)
- Quantum Fresh High-Wall (WYT-FA)
Steps
1. Open the front panel.
2. Remove any filters.
3. Pour water over the coils.
4. Check whether the water is exiting the drain point correctly. 