Support Center logo
Support Center logo

All articles

Conduct Drainage Tests for Floor-Ceiling Flex-Mounted SystemsUpdated an hour ago

Introduction

This article explains how to run and complete a drainage test for floor-ceiling flex-mounted systems. 

This test ensures the drainpipe properly directs condensate to a suitable location.

This article applies to the following systems: 

Steps

1. Confirm that the drainpipe is unobstructed and each joint is air-proof. 

2. Pour a half gallon (2,000 ml) of water into the drain pan. 

3. Check whether the water is exiting the drain point correctly. 

Was this article helpful?
Yes
No