Support Center logo
Support Center logo

All articles

Wrap the Lines & Seal the Air Gaps for Quantum Ultra Floor-Ceiling Flex (UYT-24) SystemsUpdated 11 days ago

Introduction

This article explains how to wrap the lines and seal the air gaps for Quantum Ultra Floor-Ceiling Flex (UYT-24) systems

Note: Even small gaps can result in air or water leakage, or cause condensation to form. 

Steps

  1. Arrange the pipes, cables, and drain hose correctly. 
  2. Lag the pipe joints with insulation material and secure them with vinyl tape. 
  3. Run the bound bundle through the wall hole, ensuring not to kink the drainpipe when binding. 
  4. Ensure that all the connections between the panel and ceiling, as well as between the panel and indoor unit are properly sealed. 
Was this article helpful?
Yes
No