Install the Hanging Bolt for Quantum Ultra Ducted Ceiling Concealed SystemsUpdated 3 hours ago

Introduction

This article explains how to install the hanging bolts for Quantum Ultra Ducted Ceiling Concealed (RYT-24) systems. 

Steps

Use four ⅜ inch threaded hanging bolts and eight washers and nuts to suspend the indoor unit. The hanging bolts are not included with the system. 

The center-to-center distance between bolts must match the specifications provided for the unit size. 

Ceiling Structure Mounting Methods

Finished Concrete (Brick or Slab)

  • Use expansion bolts to fix the hanging hooks directly into the concrete. 
  • Drill a hole to a depth of 45-50 mm to ensure anchoring. 

New Concrete Bricks

  • Use one of the following methods to embed the screw bolts: 
    • Blade-type insertion
    • Slide-in channel insertion
  • Ensure the screw bolts are anchored firmly into embedded steel reinforcements bars. 

Steel Roof Beam Structure

  • Install supporting angle steel brackets. 
  • Mount the hanging bolts through the brackets and secure as shown below:

Wooden Construction

  • Secure angle iron across the wooden joints. 
  • Secure the hanging screw bolts through the channel and into the ceiling structure below. 
Was this article helpful?
Yes
No