Understand How to Install Ducted Central Split Outdoor Units on Support PadsUpdated 25 days ago
This article explains how to properly install outdoor units on pads for Vertex Ducted Central Split (DYC-18) systems.
Consider the following:
- All sides of the pad must be at least 1-2 inches (25-51 mm) larger than the unit.
- The pad must be separate from any structure.
- The pad must be level.
- Ensure that the pad is high enough above the ground for proper drainage.
- The location of the pad must comply with national, state, and local regulations.
